SAP S/4HANA Production Planning and Manufacturing C_TS422_1909 Dumps With Actual Questions

SAP S/4HANA Production Planning and Manufacturing C_TS422_1909 Dumps With Actual Questions

Passing the SAP certification C_TS422_1909 exam and earning the SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing certification proves that the candidates have an overall understanding of the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. Now, candidates can choose the C_TS422_1909 dumps to start learning all these actual questions and answers to ensure they can pass the SAP S/4HANA Production Planning and Manufacturing exam on the first attempt.

Before Choosing SAP C_TS422_1909 Dumps, You Can Check The Free Dumps Demo

Page 1 of 3

1. An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master .

What determines whether the storage location can be derived from the production version?

2. Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

3. How can you achive a feasible production plan in case of capacity constraints?

4. You are working with planning strategy 40 (Planning-with-final assembly)

When does consuption of planned independent requirements take places?

5. What type of time element can be reduced by strategy settings while dispatching?

6. How can you limit the validity of a bill of material (BOM)?

7. 1.You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched .

How does the insertion take place?

8. Which SAP application can be used for forcasting in Supply Chain Planning?

9. You have maintained the parameters for simple discontinuation in the material master of a component .

Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

10. Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?


 

Share this post

Leave a Reply

Your email address will not be published. Required fields are marked *